Outside edge of subfloor More in post
Posted: Sun Jan 23, 2011 11:10 am
The home I purchased has subfloor damaged by water coming in at the windows. I have to replace lower outside 1/2 board and sub-flooring. The question I have is the 3/4 board goes under the framing on the sides of the outside walls. I cut the flooring out and than saw the staples to remove the rotted board? But since it is under weight from the roof I need to use either 2x4 or 2x6 to place under the outside wall and mount to the main beams which are not rotted thank god. to secure the weight...Than I add ascrew trim edge along the beam to srew the 3/4 sub floor is this correct......Thanks....