Hello All,
We have suffered a lengthy failure of our water heater (due to no drain or pan and linoleum stretching far into the bedroom and closet under the carpet) to the point where our sub-floor has given way all the way through the exterior wall to the platform frame bottom joist. I can chip away the soaked MDF all the way through to where it reaches the compression of the frame, but I would like to chip out the area of compression to be able to put the new sub-floor in all the way.
Yes there is extensive mold and I am dealing with it with all the common precautions as well as using Shockwave on the lumber.
I realize that this is really not a DIY project but I have to exhaust my own options as much as possible at least in demolition before I get a contractor in.
What would be the best way to separate the platform frame sub-floor from the exterior wall? It runs at least 14 feet, from the laundry area to nearly the end of the closet. I am thinking two steel shores (screw type) to use either on both ends of the entire span, or just do one piece at a time starting in the center. Also was considering saving money by using bottle jacks since I will never be in danger by them losing air from one day to the next. I would think I only need the slightest of margins to slip the new subfloor under the frame, maybe a half inch.
What do you all think or recommend?
Jacking up a wall off platform frame to replace subfloor
Moderators: Greg, Mark, mhrAJ333, JD
I use a big crow bar and a steel pick bar to pry up on the walls when shoving a piece of 3/4" plywood under the wall framing, dealing with one piece of new subfloor at a time. This is pretty much a two man operation, as I usually need to pound the new plywood into place with a 4# sledge and piece of 2x4 to protect the edges. If I am working by myself, I use 1" shims. You don't want much clearance because you don't want to move the roof very much when "jacking" up the wall. Really don't need actual jacks, a big crow bar will lift the wall.
☯JD♫
Today is PERFECT!
All information and advice given is for entertainment and informational purposes only. The person doing the work is solely responsible to insure that their work complies with their local building code and OSHA safety regulations.
Today is PERFECT!
All information and advice given is for entertainment and informational purposes only. The person doing the work is solely responsible to insure that their work complies with their local building code and OSHA safety regulations.
-
- Posts: 5
- Joined: Thu Aug 18, 2011 9:19 pm
Pictures to come later, am only taking about one per day...
What I ended up doing was cutting out the outside sheathing on the wall by 1 foot to get rid of the mold.
Then I had access to the 2x6 exterior wall studs. I took four long 3/8" carriage bolts and an 8 1/2 foot 2x4 and drilled through the 2x4 and 2x6 lengthwise on the 16" centers.
I then took a scissor jack from the car, used another cut 2x4 as a brace and put a solid cement paver stone under the jack. I jacked up the wall enough to see it move about a quarter of an inch or so along the length of the 2x4.
I then used a third 2x4 cut to exact length and pounded it in supporting the brace to the cement pad below (the jack and paver were on the grass to give room at a slight angle.
Finally, I took a long split piece of 2x4 (you can also cut one) as a wedge. The wedge would be pounded in and removed as needed, working down the outside wall. Sawzall with a two different bi-metal blades to cut through the subfloor connection top and bottom (glue and staples, occasional nail needed blade change to higher TPI then switch back) then used a large ball-peen hammer and 1x4 handheld piece as the "chisel" to pound the 3/4 rotted floor through. Used a spyder scraper blade on the reciprocating saw to clean joists of glue and particle board residue, pulled alot of rusty staples with channel locks.
Cleaned up, used Shockwave Fungicide on structural members affected by mold, laid new R-30 batting, and new 3/4 Plytanium placed from the inside pounded out with 2x4 and ball-peen into place, using the wedge again at the outside edge of each 48" section.
As of this writing still have two more pieces to lay, but have to notch out plumbing and other obstacles for precise fit.
What I ended up doing was cutting out the outside sheathing on the wall by 1 foot to get rid of the mold.
Then I had access to the 2x6 exterior wall studs. I took four long 3/8" carriage bolts and an 8 1/2 foot 2x4 and drilled through the 2x4 and 2x6 lengthwise on the 16" centers.
I then took a scissor jack from the car, used another cut 2x4 as a brace and put a solid cement paver stone under the jack. I jacked up the wall enough to see it move about a quarter of an inch or so along the length of the 2x4.
I then used a third 2x4 cut to exact length and pounded it in supporting the brace to the cement pad below (the jack and paver were on the grass to give room at a slight angle.
Finally, I took a long split piece of 2x4 (you can also cut one) as a wedge. The wedge would be pounded in and removed as needed, working down the outside wall. Sawzall with a two different bi-metal blades to cut through the subfloor connection top and bottom (glue and staples, occasional nail needed blade change to higher TPI then switch back) then used a large ball-peen hammer and 1x4 handheld piece as the "chisel" to pound the 3/4 rotted floor through. Used a spyder scraper blade on the reciprocating saw to clean joists of glue and particle board residue, pulled alot of rusty staples with channel locks.
Cleaned up, used Shockwave Fungicide on structural members affected by mold, laid new R-30 batting, and new 3/4 Plytanium placed from the inside pounded out with 2x4 and ball-peen into place, using the wedge again at the outside edge of each 48" section.
As of this writing still have two more pieces to lay, but have to notch out plumbing and other obstacles for precise fit.
-
- Posts: 195
- Joined: Fri Nov 13, 2009 2:09 am
- Location: Indiana
Sounds like you got it covered, dont forget to take a few pics of your work. Nice job!!
Tip your bartender.....
-
- Posts: 5
- Joined: Thu Aug 18, 2011 9:19 pm
Got the pics, don't know how to post them here though.
Under the text box that you post your reply in, you will see a shaded area with two tabs, OPTIONS and UPLOAD ATTACHMENTS. Click upload attachments to upload your pictures.
☯JD♫
Today is PERFECT!
All information and advice given is for entertainment and informational purposes only. The person doing the work is solely responsible to insure that their work complies with their local building code and OSHA safety regulations.
Today is PERFECT!
All information and advice given is for entertainment and informational purposes only. The person doing the work is solely responsible to insure that their work complies with their local building code and OSHA safety regulations.
-
- Posts: 5
- Joined: Thu Aug 18, 2011 9:19 pm
What is the file KB limit? I got two pictures in and it kicked me off at 225k
-
- Posts: 5
- Joined: Thu Aug 18, 2011 9:19 pm
here is one picture
You do not have the required permissions to view the files attached to this post.
-
- Similar Topics
- Replies
- Views
- Last post
-
-
Bathroom subfloor water damage from toilet supply line
by Bluejayz79 » Mon Jul 23, 2018 7:29 pm » in Mobile Home Repair - 1 Replies
- 29038 Views
-
Last post by Greg
Tue Jul 24, 2018 7:20 pm
-
-
- 2 Replies
- 3916 Views
-
Last post by dsmnightmare
Mon Dec 17, 2018 9:29 pm
-
- 2 Replies
- 11049 Views
-
Last post by Mark440
Wed Apr 10, 2019 8:41 am
-
-
Replace Roof Sheathing and Truss Question
by MandMLawson » Mon Aug 28, 2017 9:16 am » in Mobile Home Repair - 4 Replies
- 36974 Views
-
Last post by Jim from Canada
Wed Aug 30, 2017 10:09 am
-
-
- 0 Replies
- 13791 Views
-
Last post by Oregon101
Wed Mar 21, 2018 11:23 am