Re: Total Remodel

Posted: Tue Jan 15, 2013 4:55 pm
by bobfather99
Great idea to level the floor first. Better to do that than to "fudge it" and have it not turn out right.

Re: Total Remodel

Posted: Tue Jan 29, 2013 12:23 am
by Djstorman
Great Job. Cant wait to see more.

Re: Total Remodel

Posted: Wed Feb 06, 2013 2:24 pm
by gtpvette
Will it ever be done??? I'll finish the knockdown on the walls on Saturday as well as the tile. Grouting on Sunday and primer the walls.

Replace all of the polybutelyne pipes with CPVC, installed shower stall and green board. Note waterproof LED Can light I put in the shower. Sweet!

Image

Image

Pocketdoor installed,, this is the view from inside the bathroom. If you looked at the eariler pictures, this was that partial wall area in the dressing ares. Also note the double light switch. One is of course the regular light switch the other is a motion activated switch. It controls a 50 watt LED can light right over the toilet. Much better than 500 watts at 3AM. These LED can lights are really slick. They are small and they generate no heat so they can touch insulation and not cause a fire. At $50 each they aren't cheap,,, but they work!

Image

Tile going in. I installed all of the full tiles,,, this weekend I'll cut/trim what's left and install them

Image

Re: Total Remodel

Posted: Tue Feb 12, 2013 1:04 pm
by gtpvette
Last weekend..... still need to set tiles on the edge of the shower and grout

Image

Re: Total Remodel

Posted: Fri Feb 15, 2013 3:59 pm
by cattus
.

Re: Total Remodel

Posted: Sat Feb 16, 2013 1:40 pm
by UmpJJ
Really like that pocket door, too. Nice work!

UmpJJ

Re: Total Remodel

Posted: Mon Feb 25, 2013 8:49 am
by gtpvette
Just a few more items,,,,, everything in the bath should be done next weekend

Image

Image

Had a visitor at the dock this weekend,,,, he likes the fresh water!

Image

Image

Image

Re: Total Remodel

Posted: Thu Mar 14, 2013 12:15 pm
by gtpvette
Bath is complete!

Image

Image

Image


These two are a couple of weeks old already. They show the new closet (the one on the right) and the mudding of the walls starting. The wall mudding is already complete,, and I've painted the ceiling and walls and installed a new ceiling fan. This weekend I should finish the mud work inside the closets and install the new laminate floor.

Image

Image

Re: Total Remodel

Posted: Wed Mar 20, 2013 8:14 am
by crackur
I enjoy your post man, come help me with mine? hahah

Re: Total Remodel

Posted: Wed Mar 20, 2013 1:10 pm
by LisaBoyer
You are an inspiration! I have shown your pics to my husband a few hundred times :)

Re: Total Remodel

Posted: Thu Mar 21, 2013 12:15 pm
by gtpvette
Thanks for the kind words. We're getting close on the master bedroom. Floor is in,, closet doors hung. Lots of trim left to do. Crown, baseboards, trim closets and doors. I'd guess two more weekend worth of work.

I'm getting the weekend off as my wife's nephew and his Mom are comming to visit. Weather looks good so I'M GOING FISHINNG!!!!!!!! YEA!!!!!

Flooring going in

Image

Towel over the window leaves a bit to be desired!! The dresser is a Craigs List find I refinished.

Image

New closet is working out great. We have so much junk,,, we need all of the storage we can get!

Image

Another Craigs list dresser I refinished. It matches one I've had since I was a kid,,, so that's like 45 years give or take. Couldn't believe I found one that matches. Ethan Allen,, good stuff. I still need to refinish the other one and bring it down for my side of the bed.

Image

Re: Total Remodel

Posted: Mon Apr 08, 2013 12:21 pm
by gtpvette
Bedroom is done. I've got to say the bed/bath area is just sooo much nicer than what it was. The pictures don't do it justice. I've got a closet organizer going in this weekend as well as the art work over the headboard.

Image

Image

Image

Now,,,, the next project,,,, the 2nd bath. Not as bad as the master bath, but certinally needs work. The plan is to put in new tub and a cultured marble surround, new vanitly, new flooring, new lighting. I won't be starting this right away.... will probablly take a month off or so. The mater bedroom and bath ended up taking 3 months of weekend to complete! Yikes!

I don't think the 2nd bath will be 1/2 that.

Image

Image

Water heater is in the corner behind the wall

Image

I guess someone was in working on the plumbing at some point. Not much of a fix!

Image

Re: Total Remodel

Posted: Sat Apr 20, 2013 9:14 am
by countrydan
awesome pics. keep up the great work.

i wondered if i could get away with tile as well but i have particle board subfloor and it doesnt feel sturdy enough. i love your plywood subfloors. def envious!!!

Re: Total Remodel

Posted: Mon Apr 29, 2013 5:02 pm
by gtpvette
We had a huge scare yesterday. The home two down caught fire. It was origionally a single wide that the previous owner had expanded onto over the years. The biggest thing was the second floor master suite. The new owners have only had it 8 weeks. There has been alot of work going on so maybe someone did something wrong. Good thing was no one was home. We saw it right after it just started,, we just grabbed the dogs threw them in the truck and moved to the end of the street. The whole front was engulfed in flames in a mater of minutes. It then just worked it's way back. Overall it burned 1 1/2 hours. It also got the doublewoide on the other side. Both burnt to the ground.

This is after,,, you see the yellow singlewide on the right,,,, I'm right next to that.

Image

This was eary on. Just the first trailer/second floor on fire. The other doublewide you see was the second one burnt to the ground.

Image

Image

Mines the bule/green one on the right;

Image

Image

CHECK YOUR SMOKE DETECTORS!!!

Re: Total Remodel

Posted: Wed May 01, 2013 6:46 am
by JeffInFL
Wow that's scary .. have they discovered the cause yet? That reminds me that I need to get a fire extinguisher before I move into mine.