Basement Options

basement options

To construct this basement, the home was set to the side by a housemover in preparation for cement walls.


set basement sewer lines

Sewer lines are set in place. In this case, the lines drain into a sealed bucket which is then pumped up to the septic system as it fills.

Also pictured is tubing for the heated floor. The cement floor will be poured right over the tubing. The tubing is laid in sections (zones) so different areas of the basement can be heated to separate temperatures. Each zone is one long piece of tubing. No connectors are to be used underneath the floor.

On this job the tubing is tied to pieces of rebar.

After the cement floor is poured and the basement is completed, the heated floor tubing is hooked to pumps, controls and a heater. A freeze-proof solution is heated and pumped through the tubes to heat the floor and the basement. 

 


 

 

tubing tied to basement rebarhook up basement heating floor tubes


 

 

 

 





Installing the Support Beams


To download a 52 page detailed PDF file on building
a wood basement or foundation, click here.